Project Details
The intent of this project is to add an 8 to 12-foot-wide multi-use path along the existing road.
-The multi-use path on the east side will cross S.R. 61 south of Woodgate Way and continue along the west side of S.R. 61 to metropolitan Boulevard.
-Existing bike lanes on both sides of the road will be removed.
-Sidewalk will be added on the west side of S.R. 61 from Gardenia Drive to Woodgate Way.
No additional right-of-way is required. Construction is not funded in the current FDOT Five-Year Work Program.
Note: All information is preliminary and subject to change without notice.
Project Overview
Project Number
448868-1
Work Type
Bike Path/Trail
Status
Design
Project Limits
S.R. 61 (Thomasville Road) from Betton Road to Metropolitan Boulevard
Project Length
2.409 miles
Project Documents
Affected Areas
Roads
SR-61/Thomasville Rd
Counties
Leon
Cities
Tallahassee
Public Meetings
Contact
Data Current as of 05/23/2023