State Road (S.R.) 155 (Meridian Road)

FDOT office in Chipley
Project photo

Project Details

The intent of this project is to resurface the existing travel lanes and auxiliary lanes on S.R. 155 (Meridian Road) from S.R. 61 (Thomasville Road) to C.R. 63A (Lakeshore Drive). A 600-foot section of sidewalk will be constructed on the west side of Meridian Road from Pinewood Drive to John Knox Road to improve connectivity. Additional improvements include upgrading existing curb ramps and pedestrian signals to meet current Americans with Disabilities Act (ADA) access requirements, updating signing and striping, and replacing guardrail, damaged curb and curb inlets.

Note: All information is preliminary and subject to change without notice.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 445634-1
Work Type Resurfacing
Status PRE-CONST.UNDERWAY
Project Limits
S.R. 155 (Meridian Road) from S.R. 61 (Thomasville Road) to C.R. 63A (Lakeshore Drive)
Project Length 2.5 miles
Project Manager Clay Hunter, P.E.

Affected Areas

Roads S.R. 155 (Meridian Road), S.R. 61 (Thomasville Road), C.R. 63A (Lakeshore Drive)
Counties Leon
Cities Tallahassee

Public Meetings

Contact

Clay Hunter, P.E.
(850) 415-9011