US 98 @ CR 30A East Inlet Beach Ped Underpass

FDOT office in Chipley
Project photo
Project Location

Project Details

This project includes constructing an 8-feet tall, 12-feet wide and 136-feet long underpass beneath U.S. 98 with safe-way lighting.

Other improvements include:

* Installing lighted access points at the northeast and southeast corners of the U.S. 98/C.R. 30A intersections. *Construction will include stairs and Americans with Disabilities Act (ADA) compliant ramps.

*Enhanced pedestrian crosswalks and sidewalks.

*Adding a new U.S. 98 eastbound right turn lane for access to C.R. 30A southbound.

*Drainage upgrades.

Traffic Impacts

Lane closures will be limited to nighttime hours, 8:30 p.m. to 5:30 a.m. Traffic shifts will be utilized to maintain the same number of lanes on U.S. 98 and C.R. 30A throughout construction. Drivers, pedestrians, cyclists, property owners, and/or tenants may experience brief, intermittent access restrictions during the replacement of driveways adjacent to U.S. 98.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 443360-1
Work Type Pedestrian Safety Improvement
Status UNDER CONSTRUCTION
Project Limits
US 98 at CR 30A
Project Length 0.600 miles
Project Manager Eric Saggars

Project Documents

Affected Areas

Roads SR 30, US 98, CR30A
Counties Walton

Public Meetings

Contact

Eric Saggars
850-415-9010