This project will resurface State Road (S.R.) 20 from S.R. 77 to S.R. 75 (US 231).

Existing travel lanes, auxiliary lanes, and paved shoulders are being resurfaced. The section consists of 12-foot travel lanes and 10-foot shoulders (5-foot paved).

Two (2) signalized intersections exist within the project limits. Both signals will be fully actuated, meaning the signal is based on what vehicles and pedestrians are detected at the intersection. The first signal will be located at the intersection of S.R. 77 and the second signal will be at the intersection with S.R. 75 (U.S. 231).

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 436266-1
Work Type Resurfacing
Status UNDER CONSTRUCTION
Project Limits
SAND HILLS TO FOUNTAIN PARK & RIDE
Project Length 15.631 miles
Estimated Completion Spring 2022
Project Manager Charles Kennedy

Affected Areas

Roads SR 20
Counties Bay

Public Meetings

Contact

Charles Kennedy
(850) 767-4933

Data current as of 08/05/2021