SR 20 from SR 77 to SR 75 (US 231)

FDOT office in Chipley
Project photo

Project Details

The intent of this project is to resurface SR 20 from SR 77 to SR 75 (US 231). Existing travel lanes, auxiliary lanes, and paved shoulders will be resurfaced. The typical section consists of 12-foot travel lanes and 10-foot shoulders (5-foot paved).

Two (2) signalized intersections exist within the project limits. The first signal is a fully actuated signal at the intersection with SR 77. The second signal is a fully actuated signal at the intersection with SR 75 (US 231). No work is anticipated except replacing traffic detector loops that are impacted by the milling operations.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 436266-1
Work Type Resurfacing
Status PRE-CONST.UNDERWAY
Project Length 15.631 miles
Project Manager John Whittington

Affected Areas

Roads SR 20
Counties Bay

Public Meetings

Contact

John Whittington
(850) 330-1714

Data current as of 08/02/2018.