Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

I-10 at Beulah Road (SR 99) Interchange PD&E Study

FDOT office in Chipley
Project photo
Project Location Map

Project Details

FDOT completed a Project Development and Environment (PD&E) study in 2021 to analyze the existing characteristics, evaluate the community needs and impacts, and develop proposed conceptual improvements for the I-10 at Beulah Road (SR 99) Interchange and Beulah Road Widening project. The intent of the project is to widen Beulah Road from W. Nine Mile Road to Isaacs Lane; construct a new alignment from Isaacs Lane to W. Kingsfield Road; construct a new interchange at I-10; and widen I-10 from the state line to the Pensacola Weigh Station.

The limits of the projects are listed by FPID below:

433113-1: New alignment from Issacs Lane to north of I-10 (0.60 miles); new interchange at I-10 and widening of I-10 from the FL state line to the Pensacola weigh station (3.25 miles).

Right-of-Way: Funded FY 2023

Construction: Not Currently Funded

433113-2: Widen Beulah Rd from south of W. Nine Mile to Frank Reeder Rd. (1.0 miles)

433113-3: Widen Beulah Rd from Frank Reeder Rd to Issacs L

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 433113-1
Work Type PD&E Study
Status PRE-CONST.UNDERWAY
Project Limits
New alignment from Issacs Lane to north of I-10; new interchange at I-10 & widening of I-10 from FL/AL state line to Pen. weigh station; Beulah Rd from south of W. Nine Mile to Frank Reeder Rd; Beulah Rd from Frank Reeder Rd to Issacs Lane
Project Length 3.087 miles
Project Manager Eric Saggars

Project Documents

Affected Areas

Roads SR 8, I-10, SR 99
Counties Escambia
Cities Pensacola

Public Meetings

Contact

Eric Saggars
850-415-9010

Data current as of 03/31/2022