U.S. 29 (North Palafox Street) from U.S. 90 (Cervantes Street) to State Road 296 (Brent Lane/Beverly Parkway)

FDOT office in Chipley
Project photo
Project Page Map

Project Details

The intent of these U.S. 29 projects is to resurface existing travel lanes, auxiliary lanes, and construct sidewalks where none exist.Additional features include:

1. Realigning S.R. 292 (Pace Boulevard) intersection to improve traffic flow

*Access to Pace Boulevard from Massachusetts Avenue will become right out only

*Massachusetts Avenue will no longer have direct access to U.S. 29

2. Safety and mobility improvements from U.S. 90 (Cervantes Street) to West Scott Street

*Reducing the number of lanes from four to two-lanes

*Constructing seven-foot bike lanes and a five-foot buffer zone

3. Upgrading traffic signals and pedestrian features to meet Americans with Disabilities Act (ADA) standardsMinor right-of-way acquisition will be required at the following intersections:

West Leonard Street

S.R. 295 (Fairfield Drive)

S.R. 292 (Pace Boulevard)

Bids for construction are scheduled to occur Spring 2023.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 432568-1
Work Type Resurfacing
Status Design
Project Limits
U.S. 29 (North Palafox Street) from U.S. 90 (Cervantes Street) to State Road 296 (Brent Lane/Beverly Parkway)
Project Length 2.524 miles
Project Manager Sandra Lamb

Project Documents

Affected Areas

Counties Escambia

Public Meetings

Data Current as of 07/26/2022