Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

US 98 Corridor Management Improvement Projects

FDOT office in Chipley
Project photo

Project Details

This is a corridor management improvements project along SR 30 (US 98) that begins at Abercrombie Road and ends at Calle de Palencia. Proposed improvements are meant to protect the functionality and improve the overall safety of the corridor. These proposed solutions include median adjustments, median closures, drainage improvements, new curb and gutter, striping, and asphalt resurfacing.

Traffic Impacts

Lane Closures: Will be limited to 9 p.m. to 5:30 a.m. No lane closures during holidays and the following special events:

Events at the Navarre Park

Spring Break (designated time period by the Department)

Bands on the Beach

Blue Angel Show

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 431883-6
Work Type Corridor/subarea Planning
Status PRE-CONST.UNDERWAY
Project Length 11.288 miles
Project Manager Hodge, Howard

Project Documents

Affected Areas

Roads US 98
Counties Santa Rosa
Cities Gulf Breeze, Navarre

Public Meetings

Contact

Howard Hodge
850-526-2291

Data current as of 2/15/2019