Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

Chester Street From SR 20 to Tom Love Road

FDOT office in Chipley
Project photo

Project Details

The intent of this project is to install a six-foot wide sidewalk along the east side of Chester Street from State Road 20 to Tom Love Road, tying into the existing sidewalk.

Traffic will be maintained on Chester Street during construction. Minimal right-of-way impacts are anticipated at a few driveway locations for the purpose of grading and reconnecting existing features. Bids for construction are scheduled to be received March 2019.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 429855-2
Work Type Sidewalk
Status CONTRACT EXECUTED
Project Length 0.846 miles
Project Manager Arrant, Nikole

Project Documents

Affected Areas

Roads Chester Street
Counties Liberty

Public Meetings

Data current as of 07/23/2018.