Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

SR 97 over Sandy Hollow Creek

FDOT office in Chipley
Project photo
State Road 97

Project Details

The principal intent of this project is to replace the existing functionally obsolete bridge (No. 480018) on SR 97 over Sandy Hollow Creek in Escambia County, Florida south of Atmore, Alabama. At the project location, the existing roadway typical section consists of two 12' lanes and 12' shoulders (5' paved). The existing bridge typical section consists of two 12' lanes and barrier rail (24' clear roadway width). The existing capacity (2 lanes) will remain the same for the new bridge. The posted speed limit on SR 97 is 55 mph within the project limits.

Traffic Impacts

Motorists are urged to slow down to the posted 45 mph speed limit and use caution when approaching the temporary bridge.

Drivers should use caution and watch for construction workers and equipment entering and exiting the work area.

There will be weight restrictions on the temporary bridge. Vehicles weighing over 88,0 0 0 pounds and cranes will be prohibited

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 425519-2
Work Type Bridge Replacement
Status UNDER CONSTRUCTION
Project Length 0.008 miles
Estimated Completion Winter 2019
Est. Construction Cost $4,956,085.00
Project Manager David Nixon

Project Documents

Affected Areas

Roads SR 97
Counties Escambia

Public Meetings

Contact

David Nixon
850-981-2765

Data current as of 1/8/2019