SR 388 from SR 79 to east of Burnt Mill Creek

FDOT office in Chipley
Project photo
Project Map

Project Details

The intent of these projects is to widen just over 6 miles of SR 388 from 2 to 4 lanes with a 12-foot shared-use path on the south and construct drainage improvements. Segment 5 is funded for right-of-way acquisition and construction. Segment 6 is not funded for right-of-way or construction in the current FDOT Five-Year Work Program.

Segment 5: from SR 79 to Northwest Florida Beaches International Airport unique features include: 4 miles, multi-lane roundabout at the entrance to Northwest Florida Beaches International Airport, 4-lane bridge over Crooked Creek, dedicated wildlife crossing under the bridge, improved signalized intersection at SR 79, and bids for construction are scheduled to be received fall 2020.

Segment 6: from Northwest Florida Beaches International Airport to east of Burnt Mill Creek unique features include: 2 miles, remove existing causeway and build a 4-lane bridge over Burnt Mill Creek, and dedicated wildlife crossing under the bridge.

Roadway Typical Section: 12-foot travel lanes, bike lanes and 12-foot shared-use path on the south.

Crooked Creek and Burnt Mill Creek Bridges Typical Section: 12-foot travel lanes, 12-foot shared-use path on the south side, and barrier wall between travel lanes and shared-use path.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 424464-5
Work Type Add Lanes & Reconstruct
Status ROW ACQUISITION BEG.
Project Limits
from SR 79 to east of Burnt Mill Creek
Project Length 3.864 miles
Project Manager Jon McClain

Project Documents

Affected Areas

Roads SR 388
Counties Bay

Public Meetings

Contact

Jon McClain
850-415-9020

Data current as of 04/07/2017.