Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

Westbay Parkway PD&E Study

FDOT office in Chipley
Project photo
Study area for West Bay Parkway

Project Details

The proposed West Bay Parkway, Segment 1 project, will extend CR 388 and provide a new four-lane, divided highway and potentially a new high-level bridge across the Intracoastal Waterway (ICWW). The PD&E Study will evaluate several alignment options north of existing State Road (SR) 30A (US 98). At the west end of the project, the study will determine the best location for the intersection with SR 30A (US 98) between CR 30 and CR 395 in Walton County. At the east end of the project, the study will determine the best location for the intersection with SR 79 in Bay County. The proposed extension is estimated to be between 11.5 and 19.0 miles long, depending on the alternative alignment selected.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 424464-2
Work Type Pd&e/emo Study
Status PRE-CONST.UNDERWAY
Project Limits
US 98 in Walton County to SR 79 in Bay County
Project Length 10.161 miles
Project Manager Vann, Alan P

Project Documents

Affected Areas

Roads Westbay Parkway From
Counties Bay

Public Meetings

Contact

Alan Vann
(850) 330-1523

Data current as of 06/05/2019.