Project Details

FDOT is working on design plans for improvements to SR 173 (South Blue Angel Parkway) from SR 292 (Sorrento Road) to north of SR 30 (US 98).

The project will address future capacity and safety issues on South Blue Angel Parkway to include:

• Widening the roadway from two to four-lanes.

• Outside bike lanes.

• Sidewalks.

• Shared use path on east side between Sorrento Road and Dog Track Road.

• Drainage improvements, and stormwater ponds.

• Intersection improvements at Sorrento Road, Dog Track Road, and US 98.

Right-of-way acquisition is required and funding anticipated to begin in Fiscal Years 2020-2021. The project is not yet funded for construction in the FDOT Five-Year Work Program.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 421012-1
Work Type Prelim Eng For Future Capacity
Status PRE-CONST.UNDERWAY
Project Length 3.239 miles
Project Manager Jon McClain

Project Documents

Affected Areas

Roads SR 173
Counties Escambia
Cities Pensacola

Public Meetings

Contact

John McClain
850-415-9020

Data current as of 02/08/2017.