Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

SR 87A Connector from CR 191 to SR 87 N

FDOT office in Chipley
Project photo

Project Details

SR 87A Connector from Munson Highway to SR 87N

The new construction of SR 87A will primarily consist of a new alignment from east of CR 191 (Munson Highway) to west of SR 87 North. The SR 87A Connector is proposed to ultimately be a 4-lane, divided highway; however, it is the intent of this project to build an interim, 2-lane facility. The proposed construction will include the realignment of Munson Highway/CR 191 at the intersection of SR 87A, and a new connection from SR 87N to SR 89N.

This project will also include paved shoulders, buffered bicycle lanes within the curbed 4-lane part of the facility, a new bridge over Clear Creek, a new signal at Munson Highway, a new signal at SR 87N, stormwater ponds, signs, and pavement markings. The proposed construction will include acquiring right-of-way for the ultimate 4-lane build out, including stormwater ponds.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 416748-9
Work Type New Connector Road
Status PRE-CONST.UNDERWAY
Project Length 6.752 miles
Project Manager Nikole Arrant

Affected Areas

Roads SR 87A, US 90, CR 191, SR 87N, SR 89
Counties Santa Rosa

Public Meetings

Contact

Nikole Arrant
850-415-9017

Data current as of 12/2/2021