The purpose and need of this study was to evaluate capacity improvements on Thomasville Road through roadway widening, new facilities on new alignments and improvements to the existing network throughout Northeast Tallahassee. The project limits included SR 61/ US 319 (Thomasville Road) from Metropolitan Boulevard to Bannerman Road/Bradfordville Road, approximately 5 miles, and SR 261 (Capital Circle Northeast) from Raymond Diehl Road to SR 61/US 319, approximately 0.5 miles. The limits also extend to the east approximately 5 miles to include the critical connections of future Welaunee development and planned roadway network.

Preferred “Build’ Concept:

The Refine Build Alternative would extend Eastbound I-10 auxiliary lane from US 27 to SR 61, provide additional queue storage lane along ramp (3 lanes total), provide additional at-grade through lane from eastbound I-10 off-ramp to Raymond Diehl Road, and provide additional eastbound right turn lane at intersection of Raymond Diehl Road and SR 261 (Capital Circle NE).

Public Meetings:

•Capital Region Transportation Planning Agency (CRTPA) Kickoff Meeting - July 2017

•CRTPA Preferred Alternative Meeting - October 2018

Status: PD&E Study Underway

Funding:

The project has been divided into the following segments future funding of design and construction:

• 222593-5: SR 263 & SR 61 (US 319)

PD&E: Underway. Design: Funded FY 2020. R/W: Unfunded. Construction: Unfunded

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 222593-5
Work Type Prelim Eng For Future Capacity
Status LINE ITEM COMPLETED
Project Limits
SR 61/ US 319 (Thomasville Road): from Metropolitan Boulevard to Bannerman Road/Bradfordville Road, approximately 5 miles, and SR 261 (Capital Circle Northeast): from Raymond Diehl Road to SR 61/US 319, approximately 0.5 miles.
Project Length 1.350 miles
Estimated Completion Winter 2019
Project Manager Kimberly Stephens

Project Documents

Affected Areas

Roads SR 61, US 319
Counties Leon
Cities Tallahassee

Public Meetings

Contact

Kimberly Stephens
850-415-9001

Data current as of 3/30/2018.