Skip to main content

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Northwest Florida Roads

Skip to main content

I-10 from W of US 90 to W of SR 263 (Capital Cir NW) PD&E

FDOT office in Chipley
Project photo
Click on the VIDEO link below to view the Virtual Porject Update

Project Details

FPID: 222530-5 & 222530-6

The Florida Department of Transportation (FDOT) is conducting a Project Development and Environment (PD&E) study to analyze the existing characteristics, evaluate the community needs and impacts, and develop proposed conceptual improvements for widening I-10.

The intent of this study is to evaluate adding capacity on I-10 by widening the roadway from four to six lanes from west of SR 10 (US 90) to west of Capital Circle NW (SR 263). The total distance of this study is approximately 4.2 miles. Interchange improvements will be evaluated as necessary.

Other associated PD&E projects are listed below:

406585-3: I-10 from east of Capital Circle (SR 261) to west of Gamble Road (SR 59).

Project Overview

Project Number 222530-5
Work Type PD&E Study
Status PRE-CONST.UNDERWAY
Project Limits
I-10, from west of US 90 to W of Capital Circle NW
Project Length 4.2 miles
Project Manager Sherry Alaghemand

Project Documents

Affected Areas

Roads I-10, US 90, SR 263, Capital Circle
Counties Gadsden, Leon
Cities Midway

Public Meetings

Contact

Sherry Alaghemand
850-330-1510

Data current as of 05/26/2020.