I-10 @ SR 95 (US 29) Interchange

FDOT office in Chipley
Project photo
222476-1 File

Project Details

This project reconstructs the interchange to address future capacity, operations, and safety issues. Major project components include.

1) Construct six new mainline lanes on I-10 through the center of the interchange (requires 6 bridges)

2) Convert existing I-10 mainline bridges to serve as proposed ramps.

3) Remove the eastbound I-10 mainline bridges to serve as proposed ramps.

4) Construct extended two-lane ramps east of the interchange.

5) Replace the existing North Palafox Street and CSX bridges to provide room for the extended ramps on I-10

6) Modify the intersection of Diamond Dairy Road at US 29 to allow access to the eastbound and westbound I-10 ramps from Diamond Dairy Road.

7) Construct stormwater ponds.

FUNDING: - Design:

Complete - Right of Way: Funded FY 2021-2023

Construction: Funded FY 2023

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 222476-1
Work Type Interchange
Status Design
Project Length 7.165 miles
Project Manager Eric Saggars

Project Documents

Affected Areas

Roads I-10/SR-8
Counties Escambia
Cities Pensacola

Public Meetings

Contact

Eric Saggars
(850) 415-9010

Data Current as of 04/05/2022