SR 85 (S Ferdon Blvd) From PJ Adams Pkwy to I-10

FDOT office in Chipley
Project photo
District 3

Project Details

This multi-lane reconstruction project consists of widening SR 85 (South Ferdon Boulevard) from four (4) lanes to six (6) lanes from PJ Adams Parkway to north of SR 8 (I-10) and shall include reconstruction of the I-10 interchange as a Diverging Diamond Interchange. The overall anticipated project length is 1.06 miles. The proposed typical section as recommended in the PDE Study (FPID 220171-2) is an urban 6-lane typical section with a 30? median, 6? sidewalk along the eastern right-of-way, and 10? multiuse path along the western right-of-way.

-Design: Funded FY 2022 -Right of Way: Unfunded - Construction: Unfunded

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 220171-6
Work Type Add Lanes & Reconstruct
Status Construction
Project Length 1.054 miles
Project Manager Eric Saggars

Affected Areas

Counties Okaloosa