Project Details
This multi-lane reconstruction project consists of widening SR 85 (South Ferdon Boulevard) from four (4) lanes to six (6) lanes from north of PJ Adams Parkway to Mirage Avenue and shall include reconstruction of SR 85 and reconfiguration of the I-10 interchange as aU-Turn Interchange. The overall anticipated project length is 1.06 miles. The proposed typical section as recommended in the PDE Study (FPID 220171-2) is an urban 6-lane typical section with a 30? median, 6? sidewalk along the eastern right-of-way, and 10? multiuse path along the western right-of-way.
-Design: Funded FY 2022 -Right of Way: Unfunded - Construction: Unfunded
Note: All information is preliminary and subject to change without notice.