US 98 (Navy Blvd) PD&E Study

FDOT office in Chipley
Project photo
Project Location

Project Details

The FDOT conducted a PD&E study along the Navy Boulevard corridor from New Warrington Road to the Bayou Chico Bridge. The area is approximately 1.4 miles in length and contains three signalized intersections and serves as a significant regional arterial connection within the Pensacola community. Navy Boulevard serves as an important regional link between community assets that includes Naval Air Station (NAS) Pensacola and the downtown Pensacola business district. The purpose of this project is to develop a complete-street concept that is safe, operationally efficient, accommodates bicycles, pedestrians and transit, meets FDOT and permitting agencies standards, handles stormwater, and achieves the desired redevelopment goals while providing access to adjacent parcels and side streets.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 218630-2
Work Type Design
Status PRE-CONST.UNDERWAY
Project Limits
from SR 295 (New Warrington Road) to Bayou Chico Bridge
Project Length 1.326 miles
Estimated Completion Summer 2020
Project Manager Kimberly Stephens

Project Documents

Affected Areas

Roads SR 30, US 98
Counties Escambia
Cities Pensacola, Warrington, West Pensacola, Myrtle Grove

Public Meetings

Contact

Kimberly Stephens
850-415-9001

Data current as of 06/14/2021