Northwest Florida Roads
Skip to main content

Project Details
The FDOT conducted a PD&E study along the Navy Boulevard corridor from New Warrington Road to the Bayou Chico Bridge. The area is approximately 1.4 miles in length and contains three signalized intersections and serves as a significant regional arterial connection within the Pensacola community. Navy Boulevard serves as an important regional link between community assets that includes Naval Air Station (NAS) Pensacola and the downtown Pensacola business district. The purpose of this project is to develop a complete-street concept that is safe, operationally efficient, accommodates bicycles, pedestrians and transit, meets FDOT and permitting agencies standards, handles stormwater, and achieves the desired redevelopment goals while providing access to adjacent parcels and side streets.
Note: All information is preliminary and subject to change without notice.
Project Overview
Project Documents
Affected Areas
Public Meetings
Contact
Data Current as of 04/05/2022