US 29 from north of SR 4 to Alabama State Line

FDOT office in Chipley
Project photo

Project Details

This is a safety improvement project where the Florida Department of Transportation (FDOT) proposes major reconstruction of the roadway, curb and gutter, sidewalk, and drainage at Jackson Street.

• Milling and Resurfacing

• Americans with Disabilities Act Improvements

• Curb and Gutter

• Drainage Upgrades

• Signing and Pavement Markings

• Signal Loop Replacement

• Driveway Modifications

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 218594-2
Work Type Safety Project
Status ROW ACQUISITION BEG.
Project Limits
From SR 4 to the Alabama State Line
Project Length 0.937 miles
Project Manager Howard Hodge

Project Documents

Affected Areas

Roads US 29, SR 4
Counties Escambia

Public Meetings

Contact

Howard Hodge
850-526-2291

Data current as of 06/14/2021