FDOT intends to resurface the existing travel lanes and auxiliary lanes on SR 392A (Hutchison Boulevard) from US 98A (Front Beach Road) to US 98A (Front Beach Road). Additional improvements include improving drainage at the westbound right turn lane on SR 392A onto Richard Jackson Boulevard, repairing pavement failures attributed to drainage problems, adding sidewalks along the south side where the sidewalk does not exist, upgrading sidewalks to meet current Americans with Disabilities Act (ADA) access requirements, and improving traffic signals at the Panama City Beach Fire Department and Clarence Street. Bids for construction are scheduled to occur fall 2021.

Note: All information is preliminary and subject to change without notice.

Project Overview

Project Number 217986-2
Work Type Resurfacing
Status PRE-CONST.UNDERWAY
Project Limits
SR 392A from US 98A to US 98A
Project Length 3.000 miles
Estimated Completion Fall 2022
Project Manager Ray Hodges

Project Documents

Affected Areas

Roads SR 392A
Counties Bay
Cities Panama City Beach

Public Meetings

Contact

Ray Hodges, P.E.
850-845-0313

Data current as of 04/26/2021